Skip to content

Conversation

grynspan
Copy link
Contributor

@grynspan grynspan commented Sep 11, 2025

This PR captures the current commit hash in a different variable from the library version. There is no user-facing impact.

Checklist:

  • Code and documentation should follow the style of the Style Guide.
  • If public symbols are renamed or modified, DocC references should be updated.

This PR captures the current commit hash in a different variable from the
library version. There is no user-facing impact.
@grynspan grynspan added this to the Swift 6.x (main) milestone Sep 11, 2025
@grynspan grynspan self-assigned this Sep 11, 2025
@grynspan grynspan added the enhancement New feature or request label Sep 11, 2025
@grynspan grynspan added build 🧱 Affects the project's build configuration or process tech-debt 💾 reduces technical debt labels Sep 11, 2025
@grynspan grynspan merged commit f5c9286 into main Sep 11, 2025
18 checks passed
@grynspan grynspan deleted the jgrynspan/factor-out-commit-hash branch September 11, 2025 18:23
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
build 🧱 Affects the project's build configuration or process enhancement New feature or request tech-debt 💾 reduces technical debt
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants